Projects
Work we have done
A sample of jobs, described the way we describe them to our own crews: what was built, in what order, and what made it difficult.

Downtown Seattle
New power service through an occupied building
A transformer vault dug in a courtyard with no access, reached by an excavator craned over a four-story building, and a duct bank through the basement.
See the project
First Hill, Seattle
Primary power duct banks and vaults in the street
About 500 feet of primary power duct bank, 350 feet of communication duct bank and eight vaults for a new building's service.
See the project
Snohomish County
12-inch ductile iron water main
About 560 feet of 12-inch ductile iron water main with a fire hydrant, a fire sprinkler service and four domestic water services.
See the project
Northwest Seattle
Demolition, mass excavation and utilities for a new home
Three structures down, 1,740 yards out, and every underground utility in for a new single-family home.
See the project
Seattle
Complete site package in ten phases
Demolition, a temporary UltraBlock wall, two levels of excavation and every utility from footing drains to a new City Light vault, on an environmentally critical area site.
See the project
Northlake, Seattle
Site utilities, and a storm main the project did not need
Checking the survey in the field showed the site already had an approved storm discharge. A 217-foot storm main and 1,000 square feet of soil cells came out of the design.
See the projectFrom the field